Equipment requirements
Page 22
FlexPS Product Guide
Cable connectors
The splice kit is used to join two cables together within a zone, either sensor cable to sensor cable
or sensor cable to lead-in cable. The termination kit is connected to the end of the sensor cable to
enable processor supervision of the cable. The connectors are mounted horizontally on the fence
using two cable ties.
Equipment requirements
After completing the layout, compile a list of equipment requirements for your site.
Table 3 System component quantities for single and dual sensor zones
Single zone
Dual zone
FlexPS dual
zone Processor
1 each
1 each
Terminator/cable
splice kit
2 each for processors using lead-in
cable; 1 each for processors that are
connected directly to sensor cable
4 each for processors using lead-in
cable; 2 each for processors that are
connected directly to sensor cable
Sensor cable
max. 300 m (984 ft.)
max. 300 m (984 ft.) X 2
Lead-in cable
if required - max. 150 m (492 ft.)
if required - max. 150 m (492 ft.) X 2
Tie wraps
1 bag of 1,000 pieces
2 bags of 1000 pieces