E
POWER UNIT
POWR
POWER UNIT
EXPLODED DIAGRAM
1
2
7
8
9
4
5
6
10
3
5-10
REMOVAL AND INSTALLATION CHART
Step
1
2
3
4
5
6
7
8
9
10
Q’ty
3
1
2
1
1
1
1
1
1
1
Service points
Follow the left ”Step” for removal.
At the starter motor side.
At the exhaust cover side.
Reverse the removal steps for installation.
Procedure/Part name
POWER UNIT REMOVAL 1
Battery cables (for E models)
Bolt
Fitting plate
Throttle cable
Engine stop switch lead
Neutral switch lead (for E models)
Fuse lead (for E models)
Crankcase breather hose
Fuel hose (fuel filter-to-fuel pump)
Pilot water hose
Shift link rod
Summary of Contents for DOLPHIN 15
Page 386: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Page 396: ......
Page 397: ......