ASSEMBL
Y AND INST
ALLA
TION
Use the following tools for assembly work.
- Philips screwdrivers (for M4,M6,M8)
- Sockets for hexagon bolts and nuts (for M8)
- Socket wrench
- 24 mm spanner
- MASTER KEYS (Accessory)
- ALLEN WRENCH (2.5 mm)
24mm
Installation and assembly of this product should take place in the following sequence.
1 Installation of Billboard
2 Connection of Front Cabinet, Rear Cabinet, and Tube
3 Fixation to Installation Site
4 Installation of Pedal
5 Preparation of Two Units for Competitive Play (1P: left side, 2P: right side)
6 Preparation for Software Installation
7 Connection of Power and Ground
8 Engagement of Power Supply and Software Installation
9 Installation of Front Design Plate
10 Engagement of Power Supply after Installing Software
11 Assembling Check
Summary of Contents for 2SPICY
Page 106: ...PARTS LIST 101 18 3 ASSY BASE CABINET APA 1100 D 1 2 Diagram of cross section A A...
Page 112: ...PARTS LIST 107 18 8 ASSY BILLBOARD APA 1400 D 1 2...
Page 114: ...PARTS LIST 109 18 9 ASSY CENTER BOX APA 1500 D 1 2...
Page 132: ...PARTS LIST 127 18 24 ASSY BASE CABINET REAR APA 3100 D 1 2...
Page 134: ...PARTS LIST 129 18 25 REAR CABINET APA 3150 D 1 2...
Page 138: ...PARTS LIST 133 18 28 ASSY PEDAL APA 3200 D 1 2...
Page 143: ...138 PARTS LIST 18 32 CONTROL UNIT APA 2100 D 1 2...
Page 148: ...143 WIRING DIAGRAM 20 WIRING DIAGRAM D 1 3 20...
Page 149: ...144 WIRING DIAGRAM 20 D 2 3...
Page 150: ...145 WIRING DIAGRAM 20 D 3 3...