Operating Manual
MG1/dw-00
page 13 / 20
en MG1/dw-00 / June 13, 2006
Rev. 10.1
INSTALLATION
Assembly utilities
!
ethyl alcohol
!
cellulose-tissue (no rag, no cloth!)
!
o-ring lifter
!
water and washing up liquid
!
cardboard discs
Preparation for assembly
ATTENTION!
The seal should remain
packed
until the following working steps have
been completely
terminated
.
Check the parts of the machine for:
•
chamfered
edges
(sliding cones i.e. 2 mm / 30° or
in accordance with EN 12756)
•
radiused transitions
•
mating fits
and o-ring
surfaces:
fine finished
Rz 10 µm
(= N7 =
CLA 63)
•
Shaft surface
in the area of the mechanical seal finished according to EN 12756:
Ra = 0.8 µm
(= N6 = CLA 32).
•
Shoulder
or stop device for the bellows of the mech. seal to take up axial forces
Check at the machine:
•
damage of connecting surfaces to the M.S.
•
mating dimensions, rectangularity and concentricity to the shaft axis.
Run-out accuracy
of the shaft (acc. to DIN ISO 5199):
•
Shaft diameters up to 50 mm:
max. 0.05 mm
•
Shaft diameters 50 mm - 100 mm:
max. 0.08 mm
•
Prepare the place of assembly, take away any not required tool, cuttings, dirty
cleaning wool etc.
•
Cover the work bench with a piece of clean, non-fibrous cardboard.
Summary of Contents for BW 10
Page 26: ......
Page 27: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 63: ......
Page 65: ...Section 1 General Information ii Table of Contents MN400 ...
Page 79: ...3 6 Maintenance Troubleshooting MN400 ...
Page 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Page 82: ......
Page 84: ......
Page 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Page 86: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 158: ...BIM 1010 2005 03 6 www nord com ...
Page 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Page 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Page 180: ......
Page 181: ......
Page 186: ......