Transport and
Intermediate Storage
Ausgabe
issue
B / 14.08.1998
Dokument
document
OM.TRA.01e
Blatt
sheet
1 (1)
3.0
Transport and Intermediate Storage
3.1
Safety Precautions
Employ appropriate transport means, hoists and
tools when transporting and storing the machine,
always observing the safety instructions.
3.2
Transport
Depending on its weight, the seepex machine must
be transported manually or with appropriate trans-
port means. Comply with the transport instructions
on the packing.
3.3
Unpacking
The design of the packing is such that the equip-ment
can be removed manually or, if demanded by the
weight, by means of appropriate hoists.
Any screw fittings between the machine and the
packing must be undone. Comply with the attached
information notices and symbols.
3.4
Intermediate Storage/Preservation
Unless otherwise indicated in the data sheet, seepex
machines are provided with preservation only for the
duration of transport. If a long period of intermediate
storage is foreseen before the machine is
commissioned, it is necessary to pro-vide
supplementary preservation. If necessary,
the appropriate measures should be drawn up in
consultation with seepex.
Intermediate storage in extreme climatic conditions is
permissible only for machine whose design is
appropriate to the circumstances. If necessary,
seepex must be consulted.
CAUTION
Pumps of the range MAP
If the period from supply and subsequent storage until
the commissioning is more than 4 weeks, the hoses
should be dismantled, refer to Point 7.
3.5
Protection against Environmental Influences
To afford protection against environmental
influences, the intermediate storage location
must be dry, enclosed and free from frost.
8
Summary of Contents for BW 10
Page 26: ......
Page 27: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 63: ......
Page 65: ...Section 1 General Information ii Table of Contents MN400 ...
Page 79: ...3 6 Maintenance Troubleshooting MN400 ...
Page 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Page 82: ......
Page 84: ......
Page 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Page 86: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 158: ...BIM 1010 2005 03 6 www nord com ...
Page 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Page 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Page 180: ......
Page 181: ......
Page 186: ......