Operating Manual
MG1/dw-00
page 16 / 20
en MG1/dw-00 / June 13, 2006
Rev. 10.1
OPERATION
Instructions for safe operation
For a single mechanical seal the
pressure in the seal chamber
(stuffing box
pressure) has to be
higher
than the ambient pressure at the machine at any time.
Otherwise the machine will
suck in air
via the sliding faces, which will result in
dry-
running
and consequent
failure
of the mechanical seal.
Damages due to dry-running are excluded from the warranty.
During every state of operation
the mechanical seal has to be constantly wetted by
the
medium
to be sealed
in its liquid form
, in particular when the machine is
started
or
stopped
. The machine design has to be such as to take this necessity into
consideration.
If the medium to be pumped builds deposits or tends to solidify during cooling down
or standstill of the machine the stuffing box has to be flushed with suitable clean
liquid. The flow and the liquid should be determined by the user.
If the operation limit values and the instructions given in this manual are followed a
trouble-free operation of the mechanical seal can be expected.
Instructions for start up
Safety checks before start up
•
Torque transmission between mechanical seal and shaft duly installed
•
Supply connections tightened pressure-sealed
•
Disposal connections installed environmentally safe
For a safe operation of the mechanical seal we
recommend to apply
at inboard
the
most suitable
type of circulation
described in
API 610 / 682
. This measure protects
the seal cavity from deposition of solids.
•
Flood machine and seal cavity (stuffing box) with medium and vent thoroughly.
!
Now the seal is ready for operation.
Summary of Contents for BW 10
Page 26: ......
Page 27: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 63: ......
Page 65: ...Section 1 General Information ii Table of Contents MN400 ...
Page 79: ...3 6 Maintenance Troubleshooting MN400 ...
Page 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Page 82: ......
Page 84: ......
Page 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Page 86: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 158: ...BIM 1010 2005 03 6 www nord com ...
Page 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Page 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Page 180: ......
Page 181: ......
Page 186: ......