Commissioning/
De-commissioning
Ausgabe
issue
B / 06.01.1997
Dokument
document
OM.COM.01e
Blatt
sheet
1 (3)
6.0
Commissioning/De-commissioning
6.1
Engineering Data
Details regarding all technical specifications and
operating conditions are given in these operating
instructions together with the data sheet, Point 9.
To guarantee the correct assignment of documen-
tation to pump, the commission number on the
cover sheet
and data sheet of these operating instructions
must match the commission number stated on
the nameplate of the pump.
6.1.1
See Point 7.2.2 for Lubricant Chart
6.2
Preparation for Operation
6.2.1
Bearing
6.2.1.1
See Point 7.2.1.4 for pump bearing.
6.2.1.2
See manufacturer's documents, Point 10, for drive
bearings.
6.2.2
Shaft Sealing
See document OM.SEA.__,.
6.2.3
Filling Up of Suction Side to Avoid Dry Running
at Startup
CAUTION
Before switching on the pump, fill the suction-sided
pump casing with fluid so that the first rotations will
lubricate the conveying elements immediately. A
small quantity of fluid is sufficient for lubrication; the
subsequent operation of the pump is self-priming,
even if an air column up to the liquid level remains.
6.2.4
Electric/Hydraulic Connections
The connections are listed in the
appended manufacturer's documents,
Point 10.
The risk of exposure to electrical
hazards must be ruled out. Always
observe the safety regulations valid
at the site of installation.
6.2.5
Checking Direction of Rotation
The rotational direction of the pump
determines the flow direction of the
conveying medium.
Flow direction
counter-clockwise
Flow direction
clockwise
Prior to commissioning the rotational direction of the
pump must be checked for compliance with the data
sheet specification and the rotational direction arrow
on the type plate of the pump.
6.3
Control and Monitoring Equipment
Where applicable, please refer to the associated
documents, Point 10, for information on
commissioning.
6.3.1
Performance Check
Any optional extras must be subjected to a
performance check in conformity with the
specifications by seepex or other manufacturers, see
manufacturer's documents.
6.3.2
Setting
Unless already performed in the factory, setting must
be carried out in accordance with the appended
manufacturer's specifications, Point 10. Pay attention
to the operating specifications in the data sheet.
12
Summary of Contents for BW 10
Page 26: ......
Page 27: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 63: ......
Page 65: ...Section 1 General Information ii Table of Contents MN400 ...
Page 79: ...3 6 Maintenance Troubleshooting MN400 ...
Page 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Page 82: ......
Page 84: ......
Page 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Page 86: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 158: ...BIM 1010 2005 03 6 www nord com ...
Page 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Page 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Page 180: ......
Page 181: ......
Page 186: ......