Maintenance & Troubleshooting 3
‐
3
MN400
Caution: To avoid damage to motor bearings, grease must be kept free of dirt.
For an extremely dirty environment, contact your Baldor distributor or
an authorized Baldor Service Center for additional information.
Relubrication Procedure
Be sure that the grease you are adding to the motor is compatible with the grease
already in the motor. Consult your Baldor distributor or an authorized service center if a
grease other than the recommended type is to be used.
Caution: Do not over-lubricate motor as this may cause premature bearing
failure.
With Grease Outlet Plug
1.
With the motor stopped, clean all grease fittings with a clean cloth.
2.
Remove grease outlet plug.
Caution:
Over-lubricating can cause excessive bearing temperatures,
premature lubrication breakdown and bearing failure.
3.
Add the recommended amount of grease.
4.
Operate the motor for 15 minutes with grease plug removed.
This allows excess grease to purge.
5.
Re
‐
install grease outlet plug.
Without Grease Provisions
Note: Only a Baldor authorized and UL or CSA certified service center can
disassemble a UL/CSA listed explosion proof motor to maintain it's
UL/CSA listing.
1.
Disassemble the motor.
2.
Add recommended amount of grease to bearing and bearing cavity. (Bearing
should be about 1/3 full of grease and outboard bearing cavity should be about
1/2 full of grease.)
3.
Assemble the motor.
Sample Relubrication Determination
Assume
‐
NEMA 286T (IEC 180), 1750 RPM motor driving an exhaust fan in an ambient
temperature of 43
°
C and the atmosphere is moderately corrosive.
1.
Table 3
‐
1 list 9500 hours for standard conditions.
2.
Table 3
‐
2 classifies severity of service as “Severe”.
3.
Table 3
‐
4 shows that 1.2 in
3
or 3.9 teaspoon of grease is to be added.
Note: Smaller bearings in size category may require reduced amounts of grease.
Summary of Contents for BW 10
Page 26: ......
Page 27: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 63: ......
Page 65: ...Section 1 General Information ii Table of Contents MN400 ...
Page 79: ...3 6 Maintenance Troubleshooting MN400 ...
Page 80: ...Baldor District Offices Baldor District Offices Baldor District Offices ...
Page 82: ......
Page 84: ......
Page 85: ...Meadowbank mining Corp ACP 700R Technical Data Sheet Reference NC01 DOSING PUMP ...
Page 86: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 158: ...BIM 1010 2005 03 6 www nord com ...
Page 162: ...BIM 1010 2005 03 10 www nord com PARTS LIST ...
Page 163: ...BIM 1010 2005 03 11 www nord com NOTES ...
Page 180: ......
Page 181: ......
Page 186: ......