![Sealite SL-C510-AIS Installation & Service Manual Download Page 7](http://html.mh-extra.com/html/sealite/sl-c510-ais/sl-c510-ais_installation-and-service-manual_1227807007.webp)
SL-C510-AIS
Compact 5-9NM Solar Marine Lantern
Latest products and information available at
www.sealite.com
7
68
660
593
557
Ø2
34
201
120°
Slot 12.6 x 21.75
6 Locations
Lantern Operation
The lantern is activated by switching the internal ON/OFF
switch. Flash Codes and Intensity settings need to be set via the
SealitePro
®
App or the Sealite IR Controller.
1. Remove the four socket-head screws on the top of the lens
assembly and lift the SL-C510 with AIS (light head) assembly
from the solar chassis. Ensure minimal disturbance or
movement of the internal wiring.
2. Switch internal ON/OFF switch to ON.
3. Carefully place the light head assembly back onto the chassis
ensuring the O-ring is properly placed.
4. Replace the four (4) socket head screws. Sealite recommends that the light head be tightened
onto the solar chassis base using a general purpose “grip tool”, similar in shape to a screwdriver,
however with the appropriate hex key head fitted.
To achieve a satisfactory seal, it is recommended that a torque of 3Nm is applied to the bolts used
for holding down the Light Head to the Solar Base and that only the supplied bolts are used.
Applying a higher torque setting is not recommended and may void warranty. If in doubt, please
contact your local Sealite representative.
5. To test, place a dark cover (towel or jacket) on top of the light to activate sensor. The light will
come on within thirty seconds.
6. The unit should be bolted to an even, flat surface.
7. Ensure that the earth stud is connected to ground.