When the power required for the application reaches 75% of the power of the two generating sets in operation (GSs at priority 01 and
02), i.e. 900 kW, the third GS (at priority 03) is then started and is synchronised with GS1 and GS2. Its flow is then closed. The third
GS thus coupled initiates its power on ramp (adjustable delay), and the distribution of power among the three generating sets takes
place.Each generating set will then take 33.33% of the required power, i.e. 300 kW, corresponding to 50% of its rated output (600 kW).
When the power required for the application reaches 75% of the power of the three GSs in operation (GSs at priority 01, 02 and 03),
i.e. 1350 kW, the fourth GS (at priority 04) is then started and synchronised with GS1, GS2 and GS3. Its flow is then closed. The fourth
GS thus coupled initiates its power on ramp (adjustable delay) and the distribution of power among the four generating sets takes
place.
Each generating set will then take 25% of the power required, i.e. 337.5 kW, corresponding to 56.25% of its rated output (600
kW).
The power required for the application may continue to increase up to the upper plant limit (95%) of 2400 kW, i.e. 2280 kW
(the setting can be changed).This corresponds of course to the upper generating set limit, i.e. 570 kW (95% of 600 kW).
Automatic operation (All Kerys PLCs in “AUTO” mode)
(coupling when stopped)
Loss of grid voltage
•
Grid loss acquisition delay (controlled by the mains detection module).
•
Generating set power units switched off.
•
Generating set start request.
•
The generating sets increase in speed.
•
Speed stabilisation delay.
•
Order of excitation for each generating set at nominal speed; the voltage is then quickly established on the busbar.
•
Start of active power distribution.
•
Resumption of application at rated voltage and frequency.
Wattmetric control
This wattmetric control will be activated after a global operation delay. This global operation enables the application to be resumed after
power is restored to the different outputs, and ensures stability of the load before the wattmetric control is started.
Depending on the power for the application, the number of generating sets in production may vary in order to optimise the production to
consumption.
The procedure is as follows:
•
End of the global operation delay.
•
Start of analysis of the active power consumed.
Example: A generating set must be stopped according to the set thresholds.
•
Power cut at the non-priority generating set, transfer of the power to the generating set(s) remaining in production.
•
Uncoupling of the non-priority generating set, at zero power, by switching on the generating set power unit.
•
Cooling
delay.
•
Generating set stopped and set to standby.
Example of increase in power:
•
Generating set start request.
•
The generating set increases in speed.
•
Alternator excitation, the generating set establishes its voltage.
•
Request for synchronisation of the generating set to the bus bar (i.e. the other coupled generating sets).
•
Generating set power unit switched off.
Return of grid voltage
•
Grid return acquisition delay (controlled by the mains detection module).
•
Generating set power units switched on.
•
Cooling
delay.
•
Generating sets stopped and set to standby.
The Kerys PLCs remain in “AUTO” mode
76/297
Summary of Contents for R570U
Page 1: ...User and maintenance manual for generating sets R570U 33504081501NE_1_1 ...
Page 15: ...Alternator Cabinet Figure 1 3 Examples of identification plates 13 297 ...
Page 18: ...Sockets voltage 208 120V 16 297 ...
Page 125: ...9 Appendix 9 1 Appendix A Engine user and maintenance manual 123 297 ...
Page 126: ...124 297 ...
Page 128: ...126 297 ...
Page 129: ...OPERATOR S MANUAL Generating set and industrial engines 16 liter EMS 2 127 297 ...
Page 159: ...157 297 ...
Page 218: ...216 297 ...
Page 220: ...218 297 ...
Page 222: ...7748681 English 12 2011 220 297 ...
Page 223: ...9 2 Appendix B Alternator user and maintenance manual 221 297 ...
Page 224: ...222 297 ...
Page 226: ...224 297 ...
Page 250: ...www leroy somer com 248 297 ...
Page 261: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 259 297 ...
Page 281: ...2012 03 e LEROY SOMER 19 Installation and maintenance R 450 AVRs 4531 en 279 297 ...
Page 282: ...www leroy somer com 280 297 ...