Temporary coupling to the grid (A651)
This configuration is designed to provide:
Emergency electricity supply to an installation following a grid loss. Return to the grid is achieved by a temporary coupling with
transfer of the generating set load to the grid.
FORCED OPERATION with a generating set.
Temporary coupling for “Effacement Jour de Pointe” (EJP)* mode or other rates (Information transmitted by dry contacts).
Regulation
module
Base
module
C
A
N
b
u
s
E
th
er
n
et
3PH + N
3PH
3PH
3PH
M
M
M
Optional
manual or
motorised
circuit
breaker
MMI Module
Application
(load)
Grid
* the “EJP” (Peak Day Load Shedding) system is specific to the French power grid.
Automatic operation (Kerys in “AUTO” mode)
(temporary “grid return” coupling)
Loss of grid voltage
•
Adjustable grid loss acquisition delay (controlled by the Kerys or by a mains detection module).
•
Generating set start request.
•
The speed and voltage of the generating set increase.
•
Power unit switched on, grid side.
•
Generating set power unit switched off after voltage and frequency stabilisation.
Return of grid voltage
•
Adjustable grid return acquisition delay (controlled by the Kerys or by a mains detection module).
•
Synchronisation of the generating set to the grid.
•
After synchronisation, the grid power unit is switched off.
•
Transfer of the active and reactive power of the generating set to the grid according to a predetermined ramp. The ramp does
not exceed 10 seconds for transfer of the generating set’s rated output. The generating set power unit is disconnected when
the power on the generating set reaches the lower limit.
•
Generating set power unit switched on.
•
Cooling
delay.
•
Generating set stopped and set to standby.
The Kerys remains in “AUTO” mode
69/297
Summary of Contents for R570U
Page 1: ...User and maintenance manual for generating sets R570U 33504081501NE_1_1 ...
Page 15: ...Alternator Cabinet Figure 1 3 Examples of identification plates 13 297 ...
Page 18: ...Sockets voltage 208 120V 16 297 ...
Page 125: ...9 Appendix 9 1 Appendix A Engine user and maintenance manual 123 297 ...
Page 126: ...124 297 ...
Page 128: ...126 297 ...
Page 129: ...OPERATOR S MANUAL Generating set and industrial engines 16 liter EMS 2 127 297 ...
Page 159: ...157 297 ...
Page 218: ...216 297 ...
Page 220: ...218 297 ...
Page 222: ...7748681 English 12 2011 220 297 ...
Page 223: ...9 2 Appendix B Alternator user and maintenance manual 221 297 ...
Page 224: ...222 297 ...
Page 226: ...224 297 ...
Page 250: ...www leroy somer com 248 297 ...
Page 261: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 259 297 ...
Page 281: ...2012 03 e LEROY SOMER 19 Installation and maintenance R 450 AVRs 4531 en 279 297 ...
Page 282: ...www leroy somer com 280 297 ...