Schindler 3100/3300/6300
J 43402603 / 01
12/269
Copyright © 2017 INVENTIO AG
operations on behalf of the owner of the installation (3.7) in conformity with the
maintenance instructions can ensure the safe and intended functioning of an installation.
The owner shall use a maintenance organization that complies with the requirements of
EN13015.
It is recommended to inform the owner of the installation about the need to use a
maintenance organization with adequate and proper insurance coverage provided by an
insurance company (4.3.2.1, Note).
The installation shall be maintained in good working order in accordance with the
installer's instructions. To this effect, regular maintenance of the installation shall be
carried out, to ensure the safety of users and reliability of the installation (4.1).
At the latest when the installation is put into service or if the installation is to remain
unused for a long period of time before first being put into service (4.3.2.3) regular
maintenance shall be carried out by a maintenance organization.
The owner of the installation shall provide to the maintenance organization the relevant
maintenance instructions when modifications were carried out on the installation (4.3.3.2
Note).
The maintenance company carries out periodic maintenance determining the frequency
of maintenance interventions (4.3.3.9) by taking into account the following non-
exhaustive list of criteria:
–
number of trips per year, operating time and any non operating periods of time
–
age and condition of the installation
–
location and type of building in which the installation is installed, as well as the needs
of the users and/or the kind of goods transported
–
local environment where the installation is situated, as well as external
environmental elements, e.g. weather conditions (rain, heat, cold etc.) or vandalism.
Based on such criteria the maintenance company shall work out a maintenance plan
(4.3.3.5) to ensure that preventive maintenance is suitable for the installation and
maintenance time is optimized, without reducing the safety of persons and without
increasing the non operational time of the installation.
The maintenance company shall be able to provide the necessary spare parts for repair
(4.3.3.13).
The maintenance company has the duty to inform the owner of the installation in due
time about necessary upgrading of the installation (4.3.3.15).
If the lift has been designed to EN 81 - 77: 2013 (Lift subject to seismic conditions), the
competent person must be ensure relevant checks listed in section 4.8 Maintenance
Plan - Guideline are carried out.
After an earthquake a full check of the whole shaft situation regarding deformation or
damage, fallen debris must be before placing the lift back into service.