![Sartorius CAIS1 Operating Instructions Manual Download Page 15](http://html1.mh-extra.com/html/sartorius/cais1/cais1_operating-instructions-manual_1199616015.webp)
Closing the Combics indicator:
t
Re-attach the front panel and secure it with
1 Nm
the ten cap nuts.
Connecting the Device to AC Power
The device is powered through the installed power cord. The power supply is
integrated into the indicator. The device can be operated with a voltage of 100 V
to 240 V.
3
The power connection must be made in accordance with the regulations applicable
in your country.
The printed voltage rating (see type label) must match the voltage in the place of
installation. If the voltage specified on the label or the plug design of the AC adapter
do not match the rating or standard you use, please contact your Sartorius office or
dealer.
t
Check the voltage rating and plug design.
t
The device must be plugged into a properly installed wall outlet.
Protection Class 1 Device
t
The device must be plugged into a properly installed wall outlet which has a
protective grounding conductor (PE).
Safety Precautions
3
If you use an electrical outlet that does not have a protective grounding conductor,
ensure that an equivalent protective conductor is installed by a certified electrician
(as specified in the applicable regulations for installation in your country).
The protective effect must not be negated by using an extension cord without
a protective grounding conductor.
Before using for the first time, any superstructure parts must be completely installed.
Avoid connecting the equipment to lines that have a heavy electrical load, e. g.
compressors, large machinery, etc.
Warm-up Time
To deliver exact results, the device must warm up for at least 30 minutes after
connection to AC power. Only after this time will the device have reached the
required operating temperature.
Using a Verified Device in Legal Metrology:
Ensure that there is a warm-up time of at least 24 hours after connection to the
power supply.
Operating Instructions Combics Indicators
15
Getting Started
Summary of Contents for CAIS1
Page 127: ...Operating Instructions Combics Indicators 127 Declarations of Conformity...
Page 128: ...128 Operating Instructions Combics Indicators Declarations of Conformity...
Page 129: ...Operating Instructions Combics Indicators 129 Declarations of Conformity...
Page 130: ...130 Operating Instructions Combics Indicators Test Certificate...
Page 131: ...Operating Instructions Combics Indicators 131 Plates and Markings...
Page 132: ...132 Operating Instructions Combics Indicators Plates and Markings...
Page 133: ...Operating Instructions Combics Indicators 133 Plates and Markings...
Page 134: ...134 Operating Instructions Combics Indicators Plates and Markings...
Page 155: ...Operating Instructions Combics Indicators 155 Appendix Guide to verification...
Page 158: ...158 Operating Instructions Combics Indicators...
Page 159: ...Operating Instructions Combics Indicators 159...