Preparation Before Operation
27
§
§
7
7
.
.
3
3
P
P
o
o
w
w
e
e
r
r
O
O
u
u
t
t
a
a
g
g
e
e
S
S
i
i
m
m
u
u
l
l
a
a
t
t
i
i
o
o
n
n
T
T
e
e
s
s
t
t
Perform a power outage test to confirm whether the UPS is working properly.
Check that Green
INPUT
has changed from blinking to on, and then proceed to
③
.
[Select]=INV ON
[Back]=Cancel
- ONLINE
****
The screen display changes
after approx. 1 second.
INV ON
Control OK
3
2
- STANDBY
****
Green: On
Green: On
Red: Off
Green: On Green: Off Red: Off
- ONLINE
****
Green: Blink On
Green: Off
Red: Off
Green: Green: Off Red: Off
Blink
On
SANYO DENKI
SANUPS A11J
- STANDBY -
Vi=*** Fi=***
After approx. 5 seconds
Green:
Off
①
Set
MAIN MCCB
of the
two UPS Units to “ON.”
The LEDs of the two UPS Units are
in the same state.
Green: On
①
Set
MAIN MCCB
on the front of the two UPS Units to “ON.”
②
Press .
③
Press .
④
Check that the LCD display and LEDs are in the states shown in the figure below.
Step
①
is not necessary if you are
continuing from Ҥ7.2 Charging
the UPS.”
Tip