![Sanyo Denki Sanups A11J Instruction Manual Download Page 22](http://html.mh-extra.com/html/sanyo-denki/sanups-a11j/sanups-a11j_instruction-manual_1198385022.webp)
UPS Installation and Wiring
19
§
§
6
6
.
.
2
2
I
I
n
n
s
s
t
t
a
a
l
l
l
l
i
i
n
n
g
g
t
t
h
h
e
e
B
B
a
a
t
t
t
t
e
e
r
r
y
y
P
P
a
a
c
c
k
k
s
s
a
a
n
n
d
d
A
A
t
t
t
t
a
a
c
c
h
h
i
i
n
n
g
g
t
t
h
h
e
e
F
F
r
r
o
o
n
n
t
t
P
P
a
a
n
n
e
e
l
l
Battery pack A and B have been installed in UPS unit before shipped out.
①
Prepare the following items supplied with the product.
②
Loosen the screws in two places on the left and right
of the front panel, and remove the front panel from
the UPS Unit.
③
Remove the logo plate from the front panel of UPS Unit 1.
④
Attach the LCD panel to the front panel.
The LCD panel is secured by magnets, but also secure it with the screws C in two places if there is the risk of it
falling off.
Screw C:
For securing LCD panel
M3×6 2
LCD panel 1
LCD panel connection cable 1
③
Pinch the tabs on the back
toward, and remove the
logo plate.
②
Loosen the screws on the
left and right using a
screwdriver or the like,
and remove the front
panel.
Battery pack A
2
When Mounting Vertically
When Mounting on Rack
④
Insert the connector parts
on the back of the LCD
panel into the holes on the
front panel.
From the back side of the
front panel, secure the
back of the LCD panel
using two screws C.
④
Insert the connector parts
on the back of the LCD
panel into the holes on the
front panel.
From the back side of the
front panel, secure the
back of the LCD panel
using two screws C.
Battery pack B
2
UPS Unit 1
UPS Unit 2
②
Loosen the screws on the
left and right using a
screwdriver or the like,
and remove the front
panel.
Proceed to step
⑤
.
The following describes the procedure for attaching the LCD
panel to UPS Unit 1. The LCD panel can be attached to either
unit 1 or unit 2, but we recommend attaching it to Unit 1.
Tip