3
.
Installing the Product
English 8/2020. Rev 0.3
17
3.7
Preparation Stage—Recommended Tools/Instruments
Installers must provide these tools for installing the battery:
Table 3-7: Recommended Tools and Instruments
No.
Items
Usage
Appearance
1
Power Screwdriver/Drill
(Max torque: 26Nm/270 kgf/cm)
To fasten SMU and SMPS assemblies to
the rack frames
(5.1–6.1Nm/50–60 kgf/cm)
2
Torque Limiter
For use with torque wrench
3
Phillips Screwdriver or Bit
To fasten SMU and SMPS assemblies to
the rack frames
(M5 Tip)
4
Box Cutter
Opening boxes
5
Forklift
Moving rack frames and pallets
containing modules and SMU
6
Insulated Torque Wrench
Installing a high-current cable
(10~50 N.m / 100 ~ 500 kgf.cm)
7
Insulated Sockets
(13 mm, 17mm and 19mm)
Installing power cables and busbars
8
Insulated Extension for Socket
Installing a power cable
9
Inclinometer/Level
Installing a rack frame
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...