3
.
Installing the Product
English 8/2020. Rev 0.3
49
5.
Connect Battery Module #1 B+ and Module #2 B- using “BUS-BAR MAIN.” Connect using an M8 screw. Measure the contact
resistance between the terminal and the bus bar.
Figure 3-43: Connect Battery Module #1 B+ and Battery Module #2 B-.
6.
Reattach Battery Module #1’s front cover and remove Battery Module #3’s front cover.
Figure 3-44: Reattach Battery Module #1’s Front Cover
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...