3
.
Installing the Product
60
English 8/2020. Rev 0.3
17.
Connect Battery Module #7 B+ and Battery Module #8 B- using “BUS-BAR MAIN.” Connect using an M8 screw. Measure the
contact resistance between the terminal and the bus bar.
Figure 3-61: Connect Battery Module #7 B+ and Battery Module #8 B-
18.
Reattach Battery Modules #7’s front cover and remove Battery Modules #9’s front cover.
Figure 3-62: Reattach Battery Modules #7’s Front Cover
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...