3
.
Installing the Product
English 8/2020. Rev 0.3
91
3.10.8
SMPS Assembly and SMU Signal Cable Connection
The following steps are only for an SMPS Assembly Type A.
1.
Connect the signal cable from the SMPS Assembly to SMU “WIRE ASSY RACK TO SYSTEM.”
Figure 3-111: CAN Signal Cable Connection from SMPS Assembly 3 Phase Type A to SMU
2.
Connect the MODBUS TCP/IP Cable
4
to the SMPS Assembly Type A.
Figure 3-112: TCP/IP Cable Connection to SMPS Assembly
3.
Connect the Dry Contact Cable to SMPS Assembly Type A
4
Not factory-provided. Must be provided by the installer or customer.
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...