3
.
Installing the Product
46
English 8/2020. Rev 0.3
NOTICE
After connecting the busbar to the terminals (battery module, SMU, fuse), measure the contact
resistance between the terminals and the busbars using a low resistance meter. Refer to Figure
3-38: Contact Resistance Probe Points (Battery Module Terminal to Busbar) for location of the
measurement. Use similar probe locations for SMU terminal to busbar contact resistance, and
fuse to busbar contact resistance. Make sure each probe is in contact with only the intended
location.
The contact resistance must be measured below 40
μΩ
. It is recommended to keep the contact
resistance in all terminals below 30
μΩ
.
Figure 3-38: Contact Resistance Probe Points (Battery Module Terminal to Busbar)
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...