Connect the DC link high-voltage terminals from the UPS.
CAUTION
Verify with a voltmeter that no power is present on the system. Disconnect all input power
supplies. Use lock out/tag out procedures to secure the UPS and battery system before
beginning this step.
In this step, the battery and UPS are isolated by the SMU because the circuit breaker in the
SMU is opened.
NOTICE
Connect the high-voltage terminals using an M12 bolt
.
The fastening torque should be 30 Nm (300 kgf/cm)
.
Figure 3-128: Connecting the DC Link High Current Terminals
3.
Special case: if connecting the battery system in three-wire system, connect two racks to the three-wire DC bus connection
according to the diagram below. System BMS must be configured to operate correctly with this connection.
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...