3
.
Installing the Product
22
English 8/2020. Rev 0.3
Configuration
Anchor points per rack
Clearance Distance (mm)
Side (end)
Side (adjacent)
Rear
Front
Multiple Racks
(Side-to-Side
and Rear-to-
Rear)
2 (Front)
not rated for seismic event
0
0
0
Workable distance
(1000 recommended)
4 (All) – Telcordia Zone 4
Workable distance
(800 recommended)
0
Workable distance
(800 recommended)
Workable distance
(1000 recommended)
Two anchor points (not rated for seismic event)
Four anchor points (Telcordia Zone 4)
Figure 3-2: Clearance Distance for Single Rack Frame
Two anchor points (not rated for seismic event)
Four anchor points (Telcordia Zone 4)
Figure 3-3: Clearance Distance for Multiple Rack Frames Installed Side-by-Side
Summary of Contents for U6A4
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 125: ...Memo ...
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...www SamsungSDI com ...