SAM4s ER-900 Series Operator's & Programming Manual v.1.3
S-Mode Programming • 113
6.
At the PC, execute the program “NEWNET_DOWN.exe”. The Download
dialog box displays.
7.
Select the appropriate com port connection at your PC at the PORT# option
buttons.
8.
Click
SEL
. find the folder where the update files are located and select
NEWNET.bin.
9.
Select
Boot Area Only
in the Select One option buttons.
10.
Press
OK
Button. The download takes about 30 seconds; the scroll bar will
track the progress of the download. At the ECR, the display will flash slowly
while the update is taking place.
11.
At the PC, the message
Completed
displays. Click
OK
and the Download
program will close. At the ECR, the display will flash rapidly.
12.
At the ECR, the display will flash rapidly, indicating the update is complete,
Turn the power switch to the
OFF
.
Update Program Area
1.
Connect the Serial Cable From ECR to PC.
2.
At the register, turn the control lock to the
S
position.
3.
Turn the power switch to the
OFF
position.
4.
Press and hold the
CASH
and
CLERK
keys. (Use the keys in their default
Summary of Contents for ER-900 Series
Page 10: ...10 Introduction SAM4s ER 900 Operator s Programming Manual prelim ...
Page 20: ...20 Introduction SAM4s ER 900 Series Operator s Programming Manual v 1 3 ...
Page 34: ...34 Getting Started SAM4s ER 900 Series Operator s Programming Manual v 1 3 ...
Page 116: ...116 S Mode Programming SAM4s ER 900 Series Operator s Programming Manual v 1 3 ...