Page - 77 -
FLF 15000/1800/500
Panther 8x8 CA-7
© 2014
Rapid Intervention System
CAUTION !
Before opening a handline discharge valve make sure that the
nozzles are held tightly - danger of water hammer effect!
Release pressure before disconnecting hose!
Twin agent rapid intervention system
Operation with water
- Operate the pump as mentioned in the
◊
"Manual Pump Operation" or
◊
"Tank Suction Operation" or
◊
"Drafting Operation from Open Water Source" or
◊
"Hydrant / Supply Operation" pump panel operation chapter.
Foam operation
- Operate the pump as mentioned in the
◊
"Foam Operation" pump panel operation chapter.
◊
Provide nozzle with the foam extension (J98). *
- Release hose reel brake (Z102).
- Remove nozzle (J99) from stowage, pull out length of hose
desired and lock brake (Z102) again.
- Open the left hose reel discharge valve:
◊
Press switch (S21).
Note:
For best foam quality, operate pumping installation with pressure
more than 6 bar!
The left hose reel discharge valve can be operated on the left
external pump control panel as well as on the cabin's pump control
panel. *
S21 Z102