![Rockwell Automation Allen-Bradley PowerFlex 20P Manual Download Page 99](http://html.mh-extra.com/html/rockwell-automation/allen-bradley-powerflex-20p/allen-bradley-powerflex-20p_manual_1475484099.webp)
Rockwell Automation Publication 20P-TG004C-EN-P - September 2021
99
Access Procedures
Chapter 3
15.
If you are reusing the bimetal thermostat that is mounted on the left SCR
module leg assembly, disconnect the wires from the connector that is
mounted on the middle, left-side of the assembly.
16.
Remove the two hexalobular screws that secure the thermostat to the
heatsink and remove the thermostat.
Install the SCR Module Leg Assembly
Install the new SCR module leg assemblies in the reverse order of removal.
•
Tightening torque for the bimetal thermostat is 1.0 N•m (8.9 lb•in).
•
Tightening torque for the SCR module leg assemblies is 4.5…5.0 N•m
(40.0…44.4 lb•in).
•
Tightening torque for the SCR module input and output terminals to the
fuse terminals and DC output busbars is 45 N•m (398 lb•in).
16
15
IMPORTANT
Apply thermal grease to the bottom of the bimetal thermostat before
installation.