![Rockwell Automation Allen-Bradley PowerFlex 20P Manual Download Page 73](http://html.mh-extra.com/html/rockwell-automation/allen-bradley-powerflex-20p/allen-bradley-powerflex-20p_manual_1475484073.webp)
Rockwell Automation Publication 20P-TG004C-EN-P - September 2021
73
Access Procedures
Chapter 3
6.
Remove the four screws and washers that secure the SCR and dual diode
modules to the heatsink and remove the modules.
Install the Field SCR and Dual Diode Modules
Install the field SCR and dual diode modules in the reverse order of removal.
•
Apply thermal grease to the bottom of the SCR and dual diode modules
before securing them to the heatsink.
ATTENTION:
Thermal grease must be applied to the bottom of the field SCR
and dual diode modules before securing them to the heatsink or damage to the
drive may occur.
Tightening torque:
2.5…5.0 N•m
(22…44 lb•in)
P2
6
6