![Roche CoaguCheck Pro II Operator'S Manual Download Page 98](http://html1.mh-extra.com/html/roche/coagucheck-pro-ii/coagucheck-pro-ii_operators-manual_1472337098.webp)
98
Inserting the code chip
1
Remove the old code chip, if one is inserted in the
meter.
2
Check that the number on the code chip matches
the number on the label of the test strip container.
3
Slide the new code chip into the code chip slot (as
shown) until you feel it snap into place.
If the code chip is missing or incorrectly inserted, a corre-
sponding error message appears in the display (refer to
the
section of this manual).
Summary of Contents for CoaguCheck Pro II
Page 1: ...CoaguChek Pro II Operator s Manual ...
Page 3: ...0 7154879001 02 2015 11 EN CoaguChek Pro II Operator s Manual Version 2 0 ...
Page 6: ...6 This page intentionally left blank ...
Page 28: ...28 1 3 Overview of the meter elements C D F H I G J B A E E ...
Page 42: ...42 This page intentionally left blank ...
Page 116: ...116 This page intentionally left blank ...
Page 138: ...138 This page intentionally left blank ...
Page 168: ...168 Codabar Code 39 Code 93 Code 128 EAN 13 Interleaved 2 5 PDF417 QR Code DataMatrix ...
Page 170: ...170 This page intentionally left blank ...
Page 174: ...174 This page intentionally left blank ...
Page 182: ...182 This page intentionally left blank ...
Page 186: ...186 This page intentionally left blank ...
Page 187: ......