![Roche CoaguCheck Pro II Operator'S Manual Download Page 154](http://html1.mh-extra.com/html/roche/coagucheck-pro-ii/coagucheck-pro-ii_operators-manual_1472337154.webp)
154
On completion of cleaning:
3
With the cover off, let the test strip guide dry for
at
least 10 minutes
before re-attaching the test strip
guide cover and testing again.
■
Visually verify that no residual moisture is seen any-
where on the test strip guide and cover at the com-
pletion of cleaning and disinfecting.
■
Ensure that the test strip guide and cover are com-
pletely dry before assembling them.
4
Re-attach the test strip guide cover to the housing.
Make sure that the cover is properly closed. You
will hear it snap into place.
8.6
Cleaning the scanner window
The scanner window should be cleaned periodically. Use
a clean, dry cloth to wipe the scanner window.
NOTICE
Damage to the instrument
■
Ensure that no liquid enters the meter when clean-
ing the test strip guide. If moisture enters the
meter, it may cause malfunction of the instrument.
■
Do not insert any objects in the test strip guide.
Doing so may damage the electrical contacts
behind the test strip guide.
Summary of Contents for CoaguCheck Pro II
Page 1: ...CoaguChek Pro II Operator s Manual ...
Page 3: ...0 7154879001 02 2015 11 EN CoaguChek Pro II Operator s Manual Version 2 0 ...
Page 6: ...6 This page intentionally left blank ...
Page 28: ...28 1 3 Overview of the meter elements C D F H I G J B A E E ...
Page 42: ...42 This page intentionally left blank ...
Page 116: ...116 This page intentionally left blank ...
Page 138: ...138 This page intentionally left blank ...
Page 168: ...168 Codabar Code 39 Code 93 Code 128 EAN 13 Interleaved 2 5 PDF417 QR Code DataMatrix ...
Page 170: ...170 This page intentionally left blank ...
Page 174: ...174 This page intentionally left blank ...
Page 182: ...182 This page intentionally left blank ...
Page 186: ...186 This page intentionally left blank ...
Page 187: ......