![Roche CoaguCheck Pro II Operator'S Manual Download Page 41](http://html1.mh-extra.com/html/roche/coagucheck-pro-ii/coagucheck-pro-ii_operators-manual_1472337041.webp)
Putting the Meter into Operation •
2
41
2.2
Powering the meter on and off
1
Place the meter on a level, vibration-free surface, or
hold it in your hand so it is roughly horizontal.
2
Power the meter on by pressing the
button.
3
To power the meter off after use, press the
button for approximately 1 second.
Checking the software version
After displaying the Roche logo, the meter briefly displays
the
Init
(for “initialization”) screen. Here you can check
which software version is currently running on your
meter. (The Init screen shown here is for illustration pur-
poses only. Version numbers on your meter may differ.)
You can also power on the meter directly by inserting a
test strip, connecting the power adapter, or by docking
it in the Handheld Base Unit.
Init
04.00.00
CoaguChek
®
Summary of Contents for CoaguCheck Pro II
Page 1: ...CoaguChek Pro II Operator s Manual ...
Page 3: ...0 7154879001 02 2015 11 EN CoaguChek Pro II Operator s Manual Version 2 0 ...
Page 6: ...6 This page intentionally left blank ...
Page 28: ...28 1 3 Overview of the meter elements C D F H I G J B A E E ...
Page 42: ...42 This page intentionally left blank ...
Page 116: ...116 This page intentionally left blank ...
Page 138: ...138 This page intentionally left blank ...
Page 168: ...168 Codabar Code 39 Code 93 Code 128 EAN 13 Interleaved 2 5 PDF417 QR Code DataMatrix ...
Page 170: ...170 This page intentionally left blank ...
Page 174: ...174 This page intentionally left blank ...
Page 182: ...182 This page intentionally left blank ...
Page 186: ...186 This page intentionally left blank ...
Page 187: ......