![Roche CoaguCheck Pro II Operator'S Manual Download Page 35](http://html1.mh-extra.com/html/roche/coagucheck-pro-ii/coagucheck-pro-ii_operators-manual_1472337035.webp)
Putting the Meter into Operation •
2
35
2
Putting the Meter into Operation
Before using the meter for the first time, perform the fol-
lowing steps:
1
Install the battery pack
2
Connect the power adapter to charge the battery
pack
3
Set the current date and time
4
Enter your chosen settings (language, unit of
measure, user administration if applicable, etc.)
Summary of Contents for CoaguCheck Pro II
Page 1: ...CoaguChek Pro II Operator s Manual ...
Page 3: ...0 7154879001 02 2015 11 EN CoaguChek Pro II Operator s Manual Version 2 0 ...
Page 6: ...6 This page intentionally left blank ...
Page 28: ...28 1 3 Overview of the meter elements C D F H I G J B A E E ...
Page 42: ...42 This page intentionally left blank ...
Page 116: ...116 This page intentionally left blank ...
Page 138: ...138 This page intentionally left blank ...
Page 168: ...168 Codabar Code 39 Code 93 Code 128 EAN 13 Interleaved 2 5 PDF417 QR Code DataMatrix ...
Page 170: ...170 This page intentionally left blank ...
Page 174: ...174 This page intentionally left blank ...
Page 182: ...182 This page intentionally left blank ...
Page 186: ...186 This page intentionally left blank ...
Page 187: ......