SECTION 6: H
EATER
I
NSTALLATION
13 of 71
FIGURE 11: Critical Han
g
er Placement
Hanger
Side View
Must Be Within 4" (10 cm)
Front View
S-hooks
Reflector
* Allows for thermal expansion of system
Typical Suspension Details
Rod 3/8"
Beam Clamp
Concrete Beam
Wood Beam
Washers
Locknut
Screw Hook
3/8"
24" min.*
(61 cm)
"X"*
Anchor
S-hooks
Chain Size
3/16"
Minimum
Turnbuckle
Not Included
Description
Part Number
S-hook
91907302
T
u
be/Reflector Hanger, Wide Pattern
03090101
Run Len
g
th
Typical Expansion
Minimum "X" Len
g
th
10' (3 m) - 50' (15 m)
±1" (3 cm)
12" (30 cm)
51' (15.5 m) - 60' (18 m)
±2" (5 cm)
18" (46 cm)
61' (18.6 m) - 80' (24 m)
±3" (8 cm)
24" (61 cm)
Summary of Contents for Energytube EM-115
Page 2: ......
Page 4: ......
Page 6: ......
Page 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart ...
Page 70: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71 ...
Page 72: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections ...
Page 74: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71 ...
Page 78: ......
Page 80: ......
Page 81: ......