EM-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
12 of 71
SECTION 6: HEATER INSTALLATION
To ens
u
re yo
u
r safety, and comply
w
ith the terms of
the
w
arranty, all
u
nits m
u
st be installed in
accordance
w
ith these instr
u
ctions.
The gas or the electrical s
u
pply lines m
u
st not be
u
sed to s
u
pport the heater.
Do not locate the gas or electric s
u
pply lines directly
o
v
er the path of the fl
u
e prod
u
cts from the heater.
The heater m
u
st be installed in a location that it is
readily accessible for ser
v
icing.
The heater m
u
st be installed in accordance
w
ith
clearances to comb
u
stibles as indicated on the
heater and in this instr
u
ction man
u
al.
The gas inlet press
u
re m
u
st be maintained as
indicated on the rating plate.
Typical installation config
u
rations are sho
w
n
on Page
13, Figure 11
.
Expansion and contraction of the t
u
be dictates that
the minim
u
m s
u
spension lengths in the table
on
Page 13, Figure 11
be maintained.
WARNING
Severe Injury Hazard
Secure burner to burner tube with bolts and
lockwashers.
Hang heater with materials with a minimum
working load of 75 lbs (33 kg).
Failure to follow these instructions can result
in death, injury or property damage.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.
Summary of Contents for Energytube EM-115
Page 2: ......
Page 4: ......
Page 6: ......
Page 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart ...
Page 70: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71 ...
Page 72: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections ...
Page 74: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71 ...
Page 78: ......
Page 80: ......
Page 81: ......