EM-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
34 of 71
8
.10 Common Vertical Ventin
g
Req
u
irements:
• Maxim
u
m of fo
u
r heaters can be commonly
v
ented
thro
u
gh the roof.
• Heaters m
u
st be of the same BTU o
u
tp
u
t.
• Heaters m
u
st be controlled by a common
thermostat.
• Connections to a common stack m
u
st be
positioned to a
v
oid direct opposition bet
w
een
streams of comb
u
stion gases.
Summary of Contents for Energytube EM-115
Page 2: ......
Page 4: ......
Page 6: ......
Page 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart ...
Page 70: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71 ...
Page 72: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections ...
Page 74: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71 ...
Page 78: ......
Page 80: ......
Page 81: ......