EM-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
16 of 71
Step 6.1 Burner Tube Installation
Step 6.2 Tube Clamp Packa
g
e Installation
7' 6" ± 1'
(229 cm ± 25 cm)
NOTE:
Tubing requires a downward
slope of 1/2" (13 mm)
per 20' (6 m) away
from burner.
S-Hook
Burner Tube
Hanger,
Wide Pattern
Offset mounting
hole must be
to the top.
Weld seam
must be to the
bottom of the tube.
Description
Part Number
B
u
rner T
u
be
03051XXX
S-hook
91907302
T
u
be/Reflector Hanger, Wide Pattern
03090101
Bolt
Tube Clamp
Flat
Washer
Nut
(Torque 120 in/lb
13.56 Nm)
Description
Part Number
Tube Clamp Packa
g
e
0131
8
901
T
u
be Clamp
01396801
Bolt
97113940
Flat Washer
95211600
N
u
t
92113900
Summary of Contents for Energytube EM-115
Page 2: ......
Page 4: ......
Page 6: ......
Page 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart ...
Page 70: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71 ...
Page 72: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections ...
Page 74: ...EM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71 ...
Page 78: ......
Page 80: ......
Page 81: ......