MAINTENANCE
Drive Sphere Replacement
1 Apply adhesive* to curtain edge drive sphere stud
before pushing through curtain and add more
adhesive to stud before tightening Adhesive must
ooze out both sides after stud is tightened
2 Stud must be tightened prior to adhesive starting to
dry. Adhesive dry time is ≈ 1 minute.
Torque spec: 16in-lbs ± 4in-lbs [1.4Nm ± .45Nm].
* Recommended adhesive for thread locking and securing
drive sphere to the edging:
Loctite
®
438 or 3M-DP8005 (supplied by others)
Retention Strip Replacement
B
D
C
A
E
1 Turn power off and follow
2 Remove lower re-feed roller (E)
3 Remove screws (C) holding retention strip with
J-Strip (D) in place and slide strip out through the top
of the lower track (B)
4 Slide new retention strip into lower track
NOTE:
Per the top view (A), orient the longer leg of
the "J" toward the lower track and the groove away
from the lower track
5 Fasten strip with screws at the bottom of lower track
DO NOT
screw strip to lower track, other than at
the bottom
Figure 83
Figure 84
Summary of Contents for FasTrax XL
Page 9: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 9...
Page 89: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 89...
Page 90: ...FasTrax XL Installation Service Owner s Manual Rite Hite 90 Publication AMEN00316 2020 07 06...
Page 91: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 91...