70
TECHNICAL ASSISTANCE SERVICE
− Apply the adhesive label (6) for G31 gas (supplied
with the conversion kit) inside the boiler casing
and remove the old G20 gas label.
6
9
On completion of kit installation, check the tightness of all the joints made.