TECHNICAL ASSISTANCE SERVICE
3
TECHNICAL ASSISTANCE SERVICE
It is essential to perform the following checks before starting up or testing the functioning of the boiler.
− Check that the water and fuel shut-off cocks are
open.
− Check that the water pressure gauge shows a
pressure over 1 bar with the system cold. Check
also that the water circuit is properly de-aerated.
− Check that the expansion vessel is correctly pre-
charged.
− Check that the electrical connections have been
made correctly.
− Check that the vent and air intake pipes have
been correctly installed and connected.
9
If you need to convert the boiler from METHANE to
LPG, contact r’s Technical Assistance Service.
− Switch the electricity supply ON at the system’s
main switch and at the control panel.
− The boiler switches on and the display shows the
software version of the main control board.
− The display shows the system status and the
temperature measured by the boiler temperatu-
re sensor.
3 .1
Preparing for initial start-up
3 .2
Initial start-up