2.12 Fusing
2.12.1 Main construction
Structural diagram
Construction
Pressure spring system.
An oil supply pad and metering blade are used.
Blade system.
Oil pump system.
Drive from the main motor.
Pick-up pawl
Fusing exit roller
Grip
Fusing exit guide plate
Pressure roller
Fusing entrance
guide plate
Right oil
skimmer
Thermistor (20
o
C: 37 K
Ω
)
Thermofuse (192
o
C)
Left oil skimmer
Metering blade
Hot roller
Upper oil pan
Heater
Oil blade
Oil supply pad
Heat insulating cover
Oil sump
Fusing unit
Fusing pressure mechanism
Oil supply mechanism
Cleaning mechanism
Oil pump mechanism
Fusing drive mechanism
1 July 1994
Fusing
2-89
Summary of Contents for PCU10
Page 3: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 36: ...SECTION 2 SECTIONAL DESCRIPTIONS...
Page 46: ...2 1 11 Paper feed operation Circuit diagram Paper Feed 1 July 1994 2 10...
Page 59: ...2 2 7 Optics operation Circuit diagram 1 July 1994 Optics 2 23...
Page 69: ...2 3 9 OPC unit operation Circuit diagram 1 July 1994 OPC Unit 2 33...
Page 76: ...2 4 5 Charging operation Circuit diagram OPC Charge 1 July 1994 2 40...
Page 82: ...2 5 4 Eraser operation Circuit diagram Erase 1 July 1994 2 46...
Page 94: ...2 7 7 Cleaning unit operation Circuit diagram Cleaning 1 July 1994 2 58...
Page 100: ...2 8 7 Timing chart OPC Filming Removal 1 July 1994 2 64...
Page 106: ...2 9 11 Development operation Circuit diagram Development 1 July 1994 2 70...
Page 121: ...2 11 3 Process control flow 1 July 1994 Process Control 2 85...
Page 138: ...2 13 9 Duplex exit operation Circuit diagram Duplex and Paper Exit 1 July 1994 2 102...
Page 156: ...ADF 1 July 1994 2 120...
Page 161: ...Exit sensor 1 July 1994 ADF 2 125...
Page 162: ...2 14 10 ADF operation Circuit diagram ADF 1 July 1994 2 126...
Page 178: ...2 16 9 LCT operation Circuit diagram Large Capacity Tray 1 July 1994 2 142...