2.11.4 Process control timing
At power ON
After power is turned on and the fusing temperature reaches 175°C, the main motor turns on to
feed out any sheets in the paper path of the machine if there are any. Then, the machine enters the
OPC idling mode. V
0
and VR compensations are done during this period as shown below. The
machine enters the copy stand-by condition after the ID sensor mode finishes.
For the VR measurement, the OPC surface is charged by the transfer corona and the quenching
lamp clears it. Then, the potential sensor (B sensor) senses the OPC surface. VR compensation is
done at power on and after every 500 or more copies.
For the V
0
measurement, the OPC surface is charged by the charge corona. Then, the potential
sensor (B sensor) senses the OPC surface without exposing. V
0
compensation is done only at
power on when the machine has been at rest more than one hour. The V
0
measurement is also
done at the end of each copy run. When the machine has been at rest less than one hour, the value
of V
0
immediately before the power was turned off is used as is.
Process Control
1 July 1994
2-86
Summary of Contents for PCU10
Page 3: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 36: ...SECTION 2 SECTIONAL DESCRIPTIONS...
Page 46: ...2 1 11 Paper feed operation Circuit diagram Paper Feed 1 July 1994 2 10...
Page 59: ...2 2 7 Optics operation Circuit diagram 1 July 1994 Optics 2 23...
Page 69: ...2 3 9 OPC unit operation Circuit diagram 1 July 1994 OPC Unit 2 33...
Page 76: ...2 4 5 Charging operation Circuit diagram OPC Charge 1 July 1994 2 40...
Page 82: ...2 5 4 Eraser operation Circuit diagram Erase 1 July 1994 2 46...
Page 94: ...2 7 7 Cleaning unit operation Circuit diagram Cleaning 1 July 1994 2 58...
Page 100: ...2 8 7 Timing chart OPC Filming Removal 1 July 1994 2 64...
Page 106: ...2 9 11 Development operation Circuit diagram Development 1 July 1994 2 70...
Page 121: ...2 11 3 Process control flow 1 July 1994 Process Control 2 85...
Page 138: ...2 13 9 Duplex exit operation Circuit diagram Duplex and Paper Exit 1 July 1994 2 102...
Page 156: ...ADF 1 July 1994 2 120...
Page 161: ...Exit sensor 1 July 1994 ADF 2 125...
Page 162: ...2 14 10 ADF operation Circuit diagram ADF 1 July 1994 2 126...
Page 178: ...2 16 9 LCT operation Circuit diagram Large Capacity Tray 1 July 1994 2 142...