2.3.7 Belt tension mechanism
The tension springs on the front and rear of the OPC
tracking unit provide tension to the OPC belt. Operation
of the handle, release lock, and release cam are the
same as the operation of the backup roller mechanism.
The release hook is fastened to the shaft of the OPC
tracking unit. One hook of the tension spring is hooked
to the release hook and the other is hooked to the stud
on the side plate of the unit.
When the handle is moved to the set position, the
separation turn roller always pulls the OPC belt by the
tensile force of the spring. When it is turned to the
release position, tension is relieved and the OPC belt
can be removed.
2.3.8 OPC unit drive
The OPC motor, built into the OPC unit, drives only the
drive roller via a timing belt. Usually, the OPC belt is
rotated by the OPC motor at a speed of approximately
20 rpm. In the OPC cleaning brush mode, the speed of
the OPC belt is reduced to one turn every 5 minutes to
prolong the cleaning time per unit area of the OPC belt.
A rubber roller with a high coefficient of friction is used
as a drive roller to prevent the belt from slipping.
Three positioning studs are mounted on the rear side
plate of the OPC unit to position the unit on the rear side
plate of the main body.
Tracking roller
OPC tracking unit
Tracking
adjusting nut
Tension spring
Handle
Set
Release
Release cam
Release hook
OPC belt
OPC sensor
Drive roller
Positioning stud
Timing belt
OPC motor
OPC Unit
1 July 1994
2-32
Summary of Contents for PCU10
Page 3: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 36: ...SECTION 2 SECTIONAL DESCRIPTIONS...
Page 46: ...2 1 11 Paper feed operation Circuit diagram Paper Feed 1 July 1994 2 10...
Page 59: ...2 2 7 Optics operation Circuit diagram 1 July 1994 Optics 2 23...
Page 69: ...2 3 9 OPC unit operation Circuit diagram 1 July 1994 OPC Unit 2 33...
Page 76: ...2 4 5 Charging operation Circuit diagram OPC Charge 1 July 1994 2 40...
Page 82: ...2 5 4 Eraser operation Circuit diagram Erase 1 July 1994 2 46...
Page 94: ...2 7 7 Cleaning unit operation Circuit diagram Cleaning 1 July 1994 2 58...
Page 100: ...2 8 7 Timing chart OPC Filming Removal 1 July 1994 2 64...
Page 106: ...2 9 11 Development operation Circuit diagram Development 1 July 1994 2 70...
Page 121: ...2 11 3 Process control flow 1 July 1994 Process Control 2 85...
Page 138: ...2 13 9 Duplex exit operation Circuit diagram Duplex and Paper Exit 1 July 1994 2 102...
Page 156: ...ADF 1 July 1994 2 120...
Page 161: ...Exit sensor 1 July 1994 ADF 2 125...
Page 162: ...2 14 10 ADF operation Circuit diagram ADF 1 July 1994 2 126...
Page 178: ...2 16 9 LCT operation Circuit diagram Large Capacity Tray 1 July 1994 2 142...