Radio Frequency Systems
BD210WLP Series Air Dryer User’s Guide
Page 24 of 101
100518832 – Rev. B
6.5.15
Power the Dryer
OFF
.
6.5.16
Remove the Precision Bleed Orifice fitting from the Outlet Port by
pressing the ferrule down then pulling the fitting upward.
NOTE:
Save this fitting for
use in low flow applications.
It is recommended that the
dryer operates with a duty
cycle of 10% or greater.
6.5.17
Connect a 3/8” air supply line to the Outlet Port.
NOTE
: If the downstream system is pressurized prior to installation of dryer,
make reasonable attempts to install the dryer while minimizing system
depressurization. Complete depressurization may result in ambient moisture being
introduced into the system, which may require extended run time and dryer
cycling to reduce or eliminate. Ambient moisture in the downstream system may
result in high humidity alarms and shutdowns.
6.5.18
When connecting to a completely depressurized system, a high
compressor run time alarm may be triggered. This alarm will need to be
manually reset until the system is pressurized and humidity levels have
reached their defined levels.
Summary of Contents for BD210WLP Series
Page 2: ......