October 7, 2016
7 - 6
Repair
9120
3.
APPLYING ADHESIVE
A.
Brush the rubber adhesive to the roughened place and let sit for 10min. Apply a second
coat of adhesive and let sit for another 10min.
B.
When the adhesive is nearly dry (doesn’t stick to the hand), affix the rubber repair patch.
C.
Join the surfaces and release any air bubbles with a trowel. Make the area smooth and
even by then applying pressure with a hand roller. Check all edges to make sure the repair
patch is glued well.
Note:
If the solution becomes too dry between coats, or if any air bubbles are
not completely rolled out, or if the mating surfaces are dry, a ‘dry joint’
will result. The joint will appear sound, but it can be quite easily pulled
apart. When testing with a finger, the solution must show aggressive
tack, but no pick-up of solution. Rolling must be firm, working from the
center of the area toward the edges, expelling the air.
D.
Careful attention is to be given when rolling down seams and patches, particularly on
curved edges. Puckers and channels must be avoided, and all seams MUST be rolled twice.
Caution:
Do not use rollers over 2” wide.
Apply maximum available pressure
Use in a well ventilated room
Keep ambient moisture as low as possible
Note:
A small amount of solvent may be used for removing surplus adhesive
from repair areas.
E.
The gas tightness can be tested after 24 hours set time at room temperature. If there is
any upward movement of the repair patch, it will need to be repatched.
F.
The working pressure can be tested after 48 hours set time at room temperature.
Summary of Contents for Coastal Commander 2.0
Page 2: ......
Page 4: ...October 7 2016 RR 2 Record of Revisions 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ......
Page 8: ...October 7 2016 SB 2 Service Bulletin 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 12: ...October 7 2016 EP 4 9120 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE...
Page 13: ...LIST OF ASSOCIATED PUBLICATIONS October 7 2016 9120 Associated Publications AP 1 None Listed...
Page 14: ...October 7 2016 AP 2 Associated Publications 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...October 7 2016 AB 2 List of Abbreviations 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 18: ...October 7 2016 TC 2 Table of Contents 9120 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Page 20: ...October 7 2016 1 2 Introduction 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...October 7 2016 2 2 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ...October 7 2016 2 6 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 38: ...October 7 2016 2 16 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...FIGURE 6 DEPLOYMENT October 7 2016 2 18 Description 9120...
Page 41: ...CHAPTER 3 DISASSEMBLY October 7 2016 9120 Disassembly 3 1 General 3 Procedures 5...
Page 42: ...October 7 2016 3 2 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 44: ...October 7 2016 3 4 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...October 7 2016 3 8 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...October 7 2016 4 2 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...October 7 2016 4 4 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 54: ...May 24 2018 4 6 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 56: ...October 7 2016 4 8 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 61: ...May 24 2018 9120 Testing 4 13 FIGURE 1 DIGITAL MANOMETER...
Page 66: ...October 7 2016 4 18 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 68: ...October 7 2016 5 2 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 70: ...October 7 2016 5 4 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 72: ...October 7 2016 5 6 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 74: ...October 7 2016 6 2 Inspection 9120...
Page 75: ...GENERAL October 7 2016 9120 Inspection 6 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 77: ...GENERAL October 7 2016 9120 Inspection 6 5 THIS PAGE INITIALLY LEFT BLANK...
Page 79: ...GAS INFLATION SYSTEM October 7 2016 9120 Inspection 6 7 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 81: ...SURVIVAL EQUIPMENT PACKS October 7 2016 9120 Inspection 6 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...October 7 2016 7 2 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...October 7 2016 7 4 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...FIGURE 1 PATCHES AND TAPE APPLICATION October 7 2016 7 12 Repair 9120...
Page 95: ...FIGURE 2 PATCH APPLICATION OVER SEAM October 7 2016 9120 Repair 7 13...
Page 98: ...October 7 2016 8 2 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...October 7 2016 8 4 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 110: ...October 7 2016 8 14 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 128: ...October 7 2016 8 32 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 129: ...CHAPTER 9 STORAGE October 7 2016 9120 Storage 9 1 General 3 s...
Page 130: ...October 7 2016 9 2 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 132: ...October 7 2016 9 4 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 133: ...CHAPTER 10 TOOL EQUIPMENT AND MATERIALS October 7 2016 9120 Tools 10 1 General 3 Tool List 5...
Page 134: ...October 7 2016 10 2 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 136: ...October 7 2016 10 4 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 140: ...October 7 2016 10 8 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 144: ...October 7 2016 10 12 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 145: ...CHAPTER 11 SPARE PARTS LIST October 7 2016 9120 Spare Parts 11 1 Introduction 3 Image List 5...
Page 146: ...October 7 2016 11 2 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 148: ...October 7 2016 11 4 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 166: ...May 24 2018 11 22 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...October 7 2016 9120 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 170: ......