75
Please refer to
Fig. 3
. Each end of the battery tray cables should have a “ring terminal” type of
connector. These connectors make it easy to achieve a secure and strong connection. Once the
cables are connected and bolted down to the inverter, connect the black cable to the negative
post of the battery (-). Then, connect the red cable to the positive post of the battery (+). If
connecting to a battery bank, make sure that the black cable connects to the negative battery
post (-) at the end of the bank (opposite to the positive battery post as shown on
Fig. 3
). It is
recommended that a fuse be placed on the hot line (positive) between the battery and inverter.
Please refer to
the owner’s manual
for the proper wire gauge size and fuse ratings for each
inverter.
Ground!
The negative battery terminal and the chassis ground of the inverter should
be connected to a system ground. This is a safety measure to prevent
electrical shock!
NOTE:
The charge controller and the inverter should be connected to the same battery
terminals (same connecting points shown in Figure 10.2), no exceptions.
Step 3:
Connecting electrical appliances to inverter
Caution!
Make sure the power load is within the rated power of the inverter. The start power
of the appliances should not exceed the peak power of the inverter.
Once the devices are connected to the AC outlet, they are ready to be powered. When the inverter
is not in use, it is recommended that you turn off the inverter (switch in
OFF
position).
Figure 10.2
Inverter wiring diagram
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...