69
Battery Configurations
The battery system can also be configured to create a “bank” of batteries. In this section, we cover
the most basic configurations. When wiring batteries, extreme attention should be given. Never
short a battery, as high currents can cause severe burns or even death.
Hazards!
It is recommended that insulated/non-conducting tools be used when
working with batteries. Never leave tools on top of the battery. Always wear
eye protection. Never touch both of the battery terminals at the same time
with your bare hands.
9.1 Series connection of batteries (12V)
Figure 9.1
Two 6V batteries connected in series
When two or more batteries are connected in a series, their voltages add up, but the Amp-Hour
(AH) capacity remains the same.
Fig. 9.1
shows two 6V batteries in series. For example, say
each battery has 225 Ah. This wiring will form a 12V battery bank with a capacity of 225 Ah. Notice
that the cables connecting the batteries in series are of heavier gauge than the ones coming from
the controller. These cables have to be of heavier gauge because when power is drawn from an
inverter, it involves large amounts of current. This interconnection cable is often sized according
to the power of the inverter.
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...