
32
Recommended tools to have before installation:
The following tools and equipment are highly recommended to have available to assist with
installation but are in no way a comprehensive list of tools that can ease installation. Installers
feel free to substitute comparable equipment where appropriate.
Image
Component
Description
Torque
Wrench
Allows for tightening of fasteners to a
specified maximum torque. Prevents
overtightening and better control of joint
assembly.
6mm Hex Bit
w/ Socket
Drive
Bit to be used with torque wrench to
drive hex cap bolts within the system
assembly. Ensure drive side is sized
appropriately to your particular socket
wrench key (usually 3/8”).
Tape Measure
Used to accurately mark spacing of
pilot holes which locate the roof
attachments for the L-Feet.
Caulking Gun
Used to direct sealant into penetrations
to avoid leaking in the roof.
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...