
74
Inverter Wiring
10.1 General information about power inverters
A power inverter, or inverter, is an electrical device that changes direct current (DC) to alternating
current (AC); the converted AC can be at any required voltage and frequency with the use of
appropriate transformers, switching, and control circuits.
Figure 10.1
Simple diagram on how the inverter works
Warning!
Please read these instructions carefully before attempting to carry out any
installation and wiring. Contact Technical support for any questions concerning
the installation.
This equipment should be installed, adjusted, and serviced by qualified electrical maintenance
personnel familiar with the construction and
operation of solar/electrical equipment and
the hazards involved. Failure to observe this
precaution may result in bodily injury and/or
damage to property.
10.2 Wiring instructions
Step 1:
Select the right input voltage
Input voltage can be 12V/24V/48V depending
on
which
products are
used.
It
is
recommended that the inverter be powered
by a battery or battery bank, as the current
drawn from the inverter can become
extremely high.
Step 2:
Connecting inverter to battery
Set the switch to
OFF
position (inverter and
appliances). Connect the battery cables to
their respective colors on the inverter i.e.
black cable goes to the black terminal on the
inverter, and the red cable goes to the red
terminal on the inverter.
DC In
AC Out
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...