
7
1. Choose Mounting Location
—
place the controller on a vertical surface protected from
direct sunlight, high temperatures, and water. Make sure there is good ventilation.
2. Check for Clearance
—
verify that there is sufficient room to run wires, as well as
clearance above and below the controller for ventilation. The clearance should be at least
6 inches (150mm).
3. Cut out Wall section
—
the recommended wall size to be cut should follow the inner
protruding part of the charge controller while being careful not to go past the mounting
holes. The depth should be at least 1.7 inches (43mm).
4. Mark Holes
5. Drill Holes
NOTE
:
The Adventurer comes equipped with screws for wall mounting. If they are not
suitable try
using Pan Head Phillips Screw 18-8 Stainless Steel M3.9 Size 25mm
length screws
.
6. Secure the charge controller.
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...