Slide panel onto brackets and fasten with end lamps
A. Hold the panel up to the pole mount to determine approximate position that End Clamps
(J) must be to hold panel.
B. Start with the bottom clamps since they will hold most of the load.
C. Slide a T-Bolt (F) through T-Slotted Bracket (A) to the appropriate location.
D. Orient the clamps as they are in
Figure 6
.
E. Once End Clamps (J) and in a position to hold the panel, slide the panel onto the bracket,
slide the End Clamp over the edge of the panel so that the surfaces are flush as shown in
Figure 7
.
F. Fasten the End Clamp with a Nut (K) and Washer (H).
G. Repeat for the other bottom End Clamp, followed by the two top End Clamps.
Figure 6
NOTE:
This is what the clamp should look like when it is fastened to the panel. Also note
that the thread length may not be as long as shown, but will still work.
J
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...