70
9.2 Parallel connection of batteries (12V)
Figure 9.2
Two 12V batteries connected in parallel
When two or more batteries are connected in parallel, their voltage remains the same but the
Amp-hour ratings add up.
Fig. 9.2
shows two 12V batteries in parallel forming a “bank”. For
example, say each battery has 100 Ah. When connected in parallel they will form a battery bank
of 12V with a capacity of 200 Ah. Notice that the cables connecting the batteries in parallel are of
heavier gauge than the ones coming from the controller. These cables have to be of heavier
gauge because when power is drawn from an inverter, it involves large amounts of current. This
interconnection cable is often sized according to the power of the inverter.
The negative cable from the controller to the battery should be placed at the opposite end of the
battery bank.
Figure 9.2
shows this connection.
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...