59
Refer
to Figure 6.1
for connections.
1. First, connect the negative cable to the
negative (−)
battery post. The best way to secure
the battery cable to the battery post is by using a
ring terminal
. A bolt is sufficient to
secure the ring terminal onto the battery post; doing so will allow for great electrical
contact. Next, connect the bare stranded portion of the cable to the
negative (−)
battery
input terminal on the charge controller.
2. Similarly to the instructions described above, connect the positive cable to the
positive
(+)
battery post. For protection, an in-line fuse can be added to this cable. This is usually
done with a fuse holder. If opting for an in-line fuse, please do the following before
connecting the
positive (+)
cable to the charge controller:
Make sure the fuse holder’s gauge wire size is matched.
Attach the fuse holder to the line with a butt connector or by soldering it.
The butt connectors recommended for this application are the type with heat shrink insulation.
This will keep will give extra protection for the internal connection.
Use a crimper to splice the Maxi fuse holder with the battery cable. Once a strong connection is
achieved, use a
heat gun
to shrink the insulation on the butt connectors.
Heat Shrink Butt Connector
Butt Connector
Crimper
Maxi Fuse Holder
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...